More With Less: How Japan Can Power AI Data Centers Without Waiting for New Generation
- Thursday, December 17, 2026
- Virtual Event
SINGAPORE
11:00AM SGT
AMSTERDAM
11:00AM CET
NEW YORK
11:00AM EST
LOS ANGELES
11:00AM PST
Directeur principal
Analyste
Power Data Center Growth Without Waiting for New Generation
AI data centers are reshaping electricity demand around the world, turning years of flat or shrinking consumption into rapid growth concentrated in a handful of regional hubs. New firm power can’t be built fast enough to keep up, and pairing renewables with storage gets expensive at the reliability levels data centers require. Japan, which has spent the last decade cutting energy consumption while improving self-sufficiency, offers a timely case study in how to meet this challenge by doing more with less.
In this webinar, we argue that grid operators and energy users can’t simply build their way out of the data center power crunch. Instead, the fastest path to new capacity lies in managing demand, not just adding supply. Drawing on examples from Japan and the U.S., we show how AI data centers can shift from being the problem to part of the solution through temporal, spatial, and storage-based flexibility, and share findings from Lux’s reliability modeling on how much storage, and what kind, data centers actually need.
Please Note
Vous recevrez un courriel de confirmation avec vos instructions de connexion personnalisées après vous être inscrit ci-dessus.
Une copie des diapositives de la présentation et de l'enregistrement du webinaire sera envoyée à toutes les personnes inscrites après le webinaire.
If you have any questions, please email [email protected].
Thank You!
Vous vous êtes inscrit au webinaire
More With Less: How Japan Can Power AI Data Centers Without Waiting for New Generation
Directeur principal
Analyste
Vous recevrez un courriel de confirmation dans les plus brefs délais. Si vous ne recevez pas d'e-mail, veuillez contacter [email protected].